Private Pool Villa Hall Thirty Seven
Thailand, Phuket, Cherngtalay
- Regular price
- ฿12,509,691 (฿58,184/SqM)
- Sale price
- ฿12,509,691 (฿58,184/SqM)
- Regular price
-
฿
Property for Sale
2 bedrooms · 2 bathrooms · 215 sqm · 1 floor
Listing ID: PC0677
• Date listed: Jul 03, 2025
What this place offers
Air Conditioning
Ceiling Fans
Fully Furnished
Terrace
Garden
Swimming Pool
24H Security
CCTV / Video Surveillance
Open Parking
About this property
A creative boutique collection pool villas especially suited to trendy singles and couples wanting a private, modern abode.
This Two bedrooms villa designed in the romantic Sino architectural concepts L shape layout around the swimming pool with a plot size 215.20 sq.m. An open living/ dining/built-in kitchen bathroom with bathtub and separated shower area, storage room and second floor terrace.
Where you'll be
Thailand, Phuket, Cherngtalay
Exact location provided after booking
Floor Plan
View
Floor Plan 1
Contact us | Meet our agent
Verified Agent
Andrea Angius
Holiplanet Real Estate Network
